Publish Time: 2024-08-13 Origin: Site
Anchor rod and anchor net support is an important part of the underground roadway of the mine, in the past, relying on manual work, labour intensity, support quality can not be guaranteed, the operating environment is poor, there is a certain degree of safety risk. For this reason, Uniroc has launched the mining anchor trolley MT571, which is jointly developed with Long Mining Institute, and it can efficiently complete the construction process of drilling, hanging and loading anchor rods on the roof and sidewalls of the roadway, which can greatly shorten the time of the support operation.
Suitable for 9-36m² section of non-coal mine, water conservancy and hydropower roadway anchor support work.
Top anchor
Side Gang Anchor
Width of the roadway
operating method
1、After the anchor trolley is in position, the hanging net arm is used to grab away the anchor net and set it on the surrounding rock;
2、Operator controls the rock drill hole by remote control and rotates the anchor bank to make the anchor rods enter the jammer;
3、Switch the advancing beam so that the anchor rods, anchor driller and anchor hole are in the same straight position, and use the anchor driller to drive the anchor rods into the anchor hole.
Main features
1、Remote control electric proportional operating system, simple operation, easy to learn and understand, safe and reliable, accurate positioning;
2、Universal modular chassis design, easy equipment maintenance and management;
3, with resin, pipe seam anchor construction dual function, one machine for two purposes;
4、Automatic drilling, automatic anti-jamming and other functions to improve the life of drilling tools;
5、Construction data is automatically recorded and stored, and downhole construction data can be uploaded through app;
6、With fault self-diagnosis and safety voice alarm system.
The section size of Alpine phosphate mine is 4.5m*3.7m, the rock solidity coefficient of the working surface is F8-12, the length of the anchor is 1.8m, the depth of the hole is 1.9m, and the time for a single anchor is 1.5 minutes.
The gradual improvement of equipment mechanisation level is the inevitable trend of mine towards intelligent and digital construction. Uniroc will continue to increase the strength of technological innovation, to overcome the core key technologies, to truly achieve unmanned or less manned construction, for the "smart mine" construction to provide solid technical equipment support and efforts, so that the roadway development faster, easier and safer!