Integrating various aerial work functions such as arch installation, steel mesh laying, blasting, and charging.
SAFER
Equipped with 2 booms and two working platforms, the workers are far away from the operating area and the working environment is safer;
MORE ECONOMICAL
Only 3 people can complete the blasting charge and arch installation and steel mesh laying, saving labor input of 3-4 people;
MORE EFFICIENT
Installing one arch frame only takes 20-30 minutes, which accelerates the process cycle and can quickly complete the loading.
Application
Jiumian Expressway, China
Guanglian Expressway, China
Huanghuang Highspeed Railway, China
Yanchong Expressway, China
Aim to solve our customers' key issues
Our solutions aim to solve our customers' key issues - including requirements to reduce operating costs, increase utilization of equipment, reduce environmental impact, and enhance health and safety conditions
Uniroc is an international brand of Hunan Wuxin Tunnel Intelligent Equipment Co., Ltd. which is a listed company in Beijing Stock Exchange (stock code: 835174).