loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

Water Conservancy And Hydropower Lining Trolley

5 0 Reviews
Availability:
Quantity:


Product description

1. Ensure that the strength of the trolley is reasonable, so that the dome and side walls of the secondary lining are smooth and flat, without wrong platforms, the front and rear rings are lapped smoothly, and the short side walls are straight;


2. Finite analysis and calculation of the force-optimized structure, under the premise of ensuring the strength, reduce the amount of steel used for the trolley and reduce the construction cost;


3. Implement standardized transformation, use a large number of standard parts, promote the versatility of trolleys, and improve the utilization rate of repetition;


4. Promote the humanization and automation of the trolley, reduce labor costs, improve construction efficiency, and reduce construction risks.


Technical parameter

Length: 6m, 9m, 10m, 12m or according to customer needs


Previous: 
Next: 
Uniroc is an international brand of Hunan Wuxin Tunnel Intelligent Equipment Co., Ltd. which is a listed company in Beijing Stock Exchange (stock code: 835174).  
 
Leave a Message
Contact Us

Quick Links

Contact Us
  Email: 
tunnel@unirocgroup.com
 Address: 
No. 18-1 Panpan Road, Economic and Technological Development Zone, Changsha City, Hunan Province, China
Newsletter
If you are interested in our products, please leave your email and we will contact you.
 Copyright © 2022 Hunan Wuxin Tunnel Intelligent Equipment Co., Ltd. All Rights Reserved.