Main features:
Strong adaptability of construction section: the first curved boom structure in China, the whole machine is small in size, which can meet the needs of most section types of construction in tunnels and tunneling, especially for pumped storage power station and hydroelectric power station tunneling, which can cover all tunnel section types of anchoring and digging operations.
Strong adaptability of working conditions: slope and turning section can be adapted, especially for the operation of hydropower tunnel group, it can meet the passability of all turning sections;
Strong adaptability of working method: the curved arm jib can work below the horizontal plane, which can meet the excavation of upward arch; it can meet the operation of anchor hole and boring hole of tunnels and tunnels, and the operation of overreach small conduit construction;
Strong adaptability of personnel: remote control operation, simple and easy to learn, the wind driller can quickly get started, and can observe the drilling situation from a close distance.
The main technical parameters
Parameters of the machine | |
Overall dimensions (L×W×H) | 8310mm×2480mm×3400mm |
Weight of the whole machine | 15600kg |
Diesel engine power | 66KW |
Carrier parameters | |
Carrier Model | 4x4 engineering chassis |
Wheelbase | 3300mm |
Maximum walking speed | 15km/h |
Maximum Climbing Gradient | 15° |
Minimum Ground Clearance | 300mm |
Drill arm | |
Support Structure of Boom | Rotary arm support |
Structure form | Single-stage telescopic, propulsion compensation |
Single rod drilling depth | 4 meters (optional) |
Feed form | Aluminium alloy |
Pushing mode | Cylinder-wire rope |
Rock drill | |
Rock Drill Model | U1838ME |
Rated impact power | 18KW |
Applicable drilling diameter | 41~89mm |
Impact frequency | 60Hz |
Impact pressure | 20MPa |
Operating range (H×W) | 11×14米 11×14meters |
Air system | |
Flow rate | 0.8m³/min |
Working air pressure | 0.8MPa |
Air compressor power | 5.5KW |
Water system | |
Flow rate | 5m³/H |
Working water pressure | 0.8~1.5MPa |
Pump power | 3KW |
Electrical system | |
Total installed power | 63.5KW |
Operating voltage/frequency | 380V/50Hz |
Cable length | 100米 |
Main features:
Strong adaptability of construction section: the first curved boom structure in China, the whole machine is small in size, which can meet the needs of most section types of construction in tunnels and tunneling, especially for pumped storage power station and hydroelectric power station tunneling, which can cover all tunnel section types of anchoring and digging operations.
Strong adaptability of working conditions: slope and turning section can be adapted, especially for the operation of hydropower tunnel group, it can meet the passability of all turning sections;
Strong adaptability of working method: the curved arm jib can work below the horizontal plane, which can meet the excavation of upward arch; it can meet the operation of anchor hole and boring hole of tunnels and tunnels, and the operation of overreach small conduit construction;
Strong adaptability of personnel: remote control operation, simple and easy to learn, the wind driller can quickly get started, and can observe the drilling situation from a close distance.
The main technical parameters
Parameters of the machine | |
Overall dimensions (L×W×H) | 8310mm×2480mm×3400mm |
Weight of the whole machine | 15600kg |
Diesel engine power | 66KW |
Carrier parameters | |
Carrier Model | 4x4 engineering chassis |
Wheelbase | 3300mm |
Maximum walking speed | 15km/h |
Maximum Climbing Gradient | 15° |
Minimum Ground Clearance | 300mm |
Drill arm | |
Support Structure of Boom | Rotary arm support |
Structure form | Single-stage telescopic, propulsion compensation |
Single rod drilling depth | 4 meters (optional) |
Feed form | Aluminium alloy |
Pushing mode | Cylinder-wire rope |
Rock drill | |
Rock Drill Model | U1838ME |
Rated impact power | 18KW |
Applicable drilling diameter | 41~89mm |
Impact frequency | 60Hz |
Impact pressure | 20MPa |
Operating range (H×W) | 11×14米 11×14meters |
Air system | |
Flow rate | 0.8m³/min |
Working air pressure | 0.8MPa |
Air compressor power | 5.5KW |
Water system | |
Flow rate | 5m³/H |
Working water pressure | 0.8~1.5MPa |
Pump power | 3KW |
Electrical system | |
Total installed power | 63.5KW |
Operating voltage/frequency | 380V/50Hz |
Cable length | 100米 |